OK I think I solved the problem.
It turned out that I didn't read the dynmat page more carefully.
I had to set IBRION=3 but my calculation was set as IBRION=2.
Strange that other jobs worked fine though.
Search found 12 matches
- Wed Apr 03, 2019 11:41 am
- Forum: VTSTTools
- Topic: Error in Dynamical Matrix run
- Replies: 1
- Views: 11367
- Wed Apr 03, 2019 8:59 am
- Forum: VTSTTools
- Topic: Error in Dynamical Matrix run
- Replies: 1
- Views: 11367
Error in Dynamical Matrix run
Hi all
I'm trying run a dynamical matrix run to get the ZPE corrections.
When running the job, I'm getting errors with NaNs appearing in the output.
I'm running the job with 9 DOFs, 3 images with NSW=4.
Could anyone explain why this error appears and suggest a way to avoid this error?
I check ...
I'm trying run a dynamical matrix run to get the ZPE corrections.
When running the job, I'm getting errors with NaNs appearing in the output.
I'm running the job with 9 DOFs, 3 images with NSW=4.
Could anyone explain why this error appears and suggest a way to avoid this error?
I check ...
- Tue Apr 02, 2019 4:39 am
- Forum: VTSTTools
- Topic: [DYNAMICAL MATRIX] Format of DISPLACECAR
- Replies: 1
- Views: 11096
[DYNAMICAL MATRIX] Format of DISPLACECAR
Hi all,
I'm trying to do a zero-point energy evaluation on metal slab-adsorbant system.
I'm trying to understand DISPLACECAR generation scripts.
So I think I know what the first 4 numbers are in the DISPLACECAR file, but I'm not really sure what the last number means.
Like:
[dx] [dy] [dz ...
I'm trying to do a zero-point energy evaluation on metal slab-adsorbant system.
I'm trying to understand DISPLACECAR generation scripts.
So I think I know what the first 4 numbers are in the DISPLACECAR file, but I'm not really sure what the last number means.
Like:
[dx] [dy] [dz ...
- Fri Oct 05, 2018 6:41 am
- Forum: VTSTTools
- Topic: NEB initial image construction
- Replies: 5
- Views: 19712
Re: NEB initial image construction
Thank you for the answer.
Regarding the distance, how close the distance between the images should be? (in other words, how many digits should I consider?)
Is 0.48 and 0.50 calculated from dist.pl close enough?
Regarding the distance, how close the distance between the images should be? (in other words, how many digits should I consider?)
Is 0.48 and 0.50 calculated from dist.pl close enough?
- Thu Oct 04, 2018 3:51 am
- Forum: VTSTTools
- Topic: NEB initial image construction
- Replies: 5
- Views: 19712
Re: NEB initial image construction
Thank you Prof. Henkelman.
Could you elaborate on making a band out of two path segments?
I can't find any parameters defining a band. Do you mean constructing N images using the Initial state and the TS guess and construct Max_image - N images using the TS guess and Final state?
Could you elaborate on making a band out of two path segments?
I can't find any parameters defining a band. Do you mean constructing N images using the Initial state and the TS guess and construct Max_image - N images using the TS guess and Final state?
- Wed Oct 03, 2018 6:37 am
- Forum: VTSTTools
- Topic: NEB initial image construction
- Replies: 5
- Views: 19712
NEB initial image construction
Hi all,
If the inital images constructed from nebmake.pl doesn't look right, would there be much problem if I tweak the constructed images manually to make a more reasonable path?
In that case, is there anything I need to consider when changing the images?
Thanks
M.-C.
If the inital images constructed from nebmake.pl doesn't look right, would there be much problem if I tweak the constructed images manually to make a more reasonable path?
In that case, is there anything I need to consider when changing the images?
Thanks
M.-C.
- Fri Aug 31, 2018 12:59 am
- Forum: VTSTTools
- Topic: NEB convergence
- Replies: 3
- Views: 16103
Re: NEB convergence
Thank you for the answer prof. Henkelman.
Some additional questions:
1. What does exactly "run the FIRE calculation longer" mean? Are you suggesting lowering the time step and/or lowering the EDIFFG of the FIRE job?
2. As I look at the images, the distance between the starting geometry of the ...
Some additional questions:
1. What does exactly "run the FIRE calculation longer" mean? Are you suggesting lowering the time step and/or lowering the EDIFFG of the FIRE job?
2. As I look at the images, the distance between the starting geometry of the ...
- Thu Aug 30, 2018 6:19 am
- Forum: VTSTTools
- Topic: NEB convergence
- Replies: 3
- Views: 16103
NEB convergence
Hi all,
I'm doing a CI-NEB calculation. Just wanted to check if this procedure makes sense.
At first, I did a continuous FIRE(EDIFFG = -1.0) -> L-BFGS(EDIFF = -0.15) job using the default TIMESTEP parameters.
The FIRE step was taking some time and when consulting the nebef.pl result, I noticed ...
I'm doing a CI-NEB calculation. Just wanted to check if this procedure makes sense.
At first, I did a continuous FIRE(EDIFFG = -1.0) -> L-BFGS(EDIFF = -0.15) job using the default TIMESTEP parameters.
The FIRE step was taking some time and when consulting the nebef.pl result, I noticed ...
- Mon Aug 27, 2018 10:27 am
- Forum: VTSTTools
- Topic: NEB energy oscillating
- Replies: 3
- Views: 20786
Re: NEB energy oscillating
Thank you for the reply.
I noticed there's another executable and now it seems to be working.
======================================
...
VTST: version 3.1, (03/28/14)
CHAIN: initializing optimizer
OPT: Using VASP QUASI-newton optimizer
CHAIN: Read ICHAIN 0
CHAIN: Running the NEB
NEB: SPRING ...
I noticed there's another executable and now it seems to be working.
======================================
...
VTST: version 3.1, (03/28/14)
CHAIN: initializing optimizer
OPT: Using VASP QUASI-newton optimizer
CHAIN: Read ICHAIN 0
CHAIN: Running the NEB
NEB: SPRING ...
- Mon Aug 27, 2018 2:01 am
- Forum: VTSTTools
- Topic: NEB energy oscillating
- Replies: 3
- Views: 20786
NEB energy oscillating
Hi all,
I'm doing a NEB calculation on oxygen dissociation.
As I checked the energies, it seems to be oscillating(or 'stuck' I'd say).
(The cnvg-f.txt file in the attachment is the result from
grep "F=" stdout
to look at E and dE)
Is this or common thing or should I rerun the calculation with ...
I'm doing a NEB calculation on oxygen dissociation.
As I checked the energies, it seems to be oscillating(or 'stuck' I'd say).
(The cnvg-f.txt file in the attachment is the result from
grep "F=" stdout
to look at E and dE)
Is this or common thing or should I rerun the calculation with ...
- Thu Aug 23, 2018 12:20 am
- Forum: VTSTTools
- Topic: NEB optimizer choice
- Replies: 3
- Views: 16482
Re: NEB optimizer choice
Thank you for the answers.
I'm trying to set up a queue submit file doing CI-NEB-FIRE with EDIFFG = --1.0 to CI-NEB-LBFGS with EDIFFG= -0.15
I changed the EDIFFG in the INCAR file after the FIRE run, and then runned LBFGS.
Strangely the EDIFFG in the subdirecteries(01-0X) don't seem to change ...
I'm trying to set up a queue submit file doing CI-NEB-FIRE with EDIFFG = --1.0 to CI-NEB-LBFGS with EDIFFG= -0.15
I changed the EDIFFG in the INCAR file after the FIRE run, and then runned LBFGS.
Strangely the EDIFFG in the subdirecteries(01-0X) don't seem to change ...
- Tue Aug 21, 2018 4:13 am
- Forum: VTSTTools
- Topic: NEB optimizer choice
- Replies: 3
- Views: 16482
NEB optimizer choice
Hi all:
I'm doing a CI-NEB calculation. I'm currently testing the calculation using different optimizers, one with the default GDIIS optimizer and one with L-BFGS.
In case the L-BFGS method fails to converge, is it reasonble to run CI-NEB with a more robust optimizer for several steps and continue ...
I'm doing a CI-NEB calculation. I'm currently testing the calculation using different optimizers, one with the default GDIIS optimizer and one with L-BFGS.
In case the L-BFGS method fails to converge, is it reasonble to run CI-NEB with a more robust optimizer for several steps and continue ...